Day-to-Day Responsibilities
Inspect the wall or ceiling and prepare it: clean it, dampen it, repair cracks and fix laths or metal lathing where needed.
Mix lime, cement, sand, plaster and additives to the right consistency for each coat, following the project specification.
Apply the base or first coat (render), level it with a straightedge, then apply the finishing coat with a trowel and float.
Form decorative features such as cornices, mouldings and ceiling roses, and finish the edges around doors and windows.
Check surfaces for flatness with a spirit level and fix defects before painters or tilers move in.
Work at height on scaffolding, ladders or platforms, following safety rules for working at height.
Read drawings and coordinate with masons, carpenters, electricians and painters to keep the schedule on track.