Day-to-Day Responsibilities
Review design documents, single-line diagrams and equipment specifications before testing begins.
Prepare commissioning plans, test scripts and checklists for power, cooling and control systems.
Verify that UPS systems, generators, switchgear, chillers and air handling units are installed and wired as designed.
Run functional and integrated tests, including power failure and load bank tests, and record every result.
Coordinate with contractors, equipment vendors, designers and the client team to resolve faults and retest.
Track snags and defects in a log, and confirm each one is closed before sign-off.
Compile commissioning reports, as-built records and operating manuals that the facility team needs at handover.